{"id":10346,"date":"2026-03-19T17:00:52","date_gmt":"2026-03-19T17:00:52","guid":{"rendered":"https:\/\/isco-pipe.com\/?post_type=field-reports&#038;p=10346"},"modified":"2026-03-19T17:00:54","modified_gmt":"2026-03-19T17:00:54","slug":"pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines","status":"publish","type":"field-reports","link":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/","title":{"rendered":"PE-RT and HDPE: The Piping Power Couple for Chilled and Hot Water Lines"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\" id=\"h-more-room-to-save-lives\">More Room To Save Lives<\/h2>\n\n\n\n<p>When Banner Health acquired the University of Arizona Health Network to form Banner University Medical Center (BUMC), they made a commitment to investing significant time and money on improving the campus in Tucson, Arizona. Part of that overall plan was constructing a new, 11-story tower to replace a 40-year-old portion of the existing hospital on the Tucson campus. <\/p>\n\n\n\n<p>$400 million was slated for the new addition. The 689,000 square foot tower will include 336 private rooms, 22 operating rooms, imaging suits, and public spaces \u2013certainly a much needed enhancement to what is considered one of the nation\u2019s top learning medical centers and southern Arizona\u2019s only Level 1 Trauma Center.<\/p>\n\n\n\n<p>The hospital hired the joint venture team of Sundt\/DPR to construct the tower, as well as an 18,600 square foot, two-story, central utility plant with six boilers, two dual-cell cooling towers, and four chillers. It is equipped to independently feed the new hospital tower with room for future expansion. <\/p>\n\n\n\n<p>When it came to running chilled and hot water lines to the building from the central plant, Sundt\/DPR needed a solution that would include the right materials, the best method, and an experienced team to overcome specific job site constraints. GLHN Architects and Engineers designed the project. Longtime partners, ISCO Industries and Rain for Rent, were brought in to provide pipe, fittings, and fusion equipment for the project. R. Directional Drilling came on board to handle the underground installation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-drilling-through-deep-challenges\">Drilling Through Deep Challenges<\/h2>\n\n\n\n<p>There were a couple of unique challenges around this project. Specifically, the location of the build site. As the only Level 1 Trauma Center in the region, it was also critical to keep all traffic patterns around the hospital intact during construction. \u201cThe site was located in an extremely congested area with very small<br>workspaces,\u201d explained George Jones, Branch Manager for the Tucson Rain for Rent. \u201cThe cost associated with an open trench install was not practical. Horizontal directional drilling (HDD) made sense and the use of HDPE was necessary because of existing conditions and the short distance between the central plant and building tie-ins. We had to go as deep as 25 feet and back to surface within a 400-foot distance.\u201d <\/p>\n\n\n\n<p>Open trenching 28-feet deep would\u2019ve added months to the completion time of the project and increased the cost significantly. Derek Reeve, Vice President of RDD agreed with Jones\u2019 assessment saying, \u201cHDD was an ideal solution due to the space and the fact that there is an existing building that had to remain occupied until after the new patient tower was erected. HDD allowed us to bore under that building while people were at their desks and place the pipe systems.\u201d<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-hdpe-the-only-option-for-chilled-water\">HDPE the Only Option for Chilled Water<\/h2>\n\n\n\n<p>For the chilled water lines, ISCO provided 960 feet of insulated 30-inch DR11 IPS HDPE pipe. \u201cFor this project, reliability and longevity were important factors to consider,\u201d said Denise Ernst, sales rep with  ISCO. \u201cThe flexibility of the pipe, zero-leak rate, and limited maintenance made HDPE the obvious choice for the chilled water lines.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>When Banner Health acquired the University of Arizona Health Network to form Banner University Medical Center (BUMC), they made a commitment to investing significant time and money on improving the campus in Tucson, Arizona.<\/p>\n","protected":false},"featured_media":10348,"template":"","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[],"tags":[270,269],"application":[181,161],"topic":[166,178],"class_list":["post-10346","field-reports","type-field-reports","status-publish","has-post-thumbnail","hentry","tag-pe-rt-en-ca","tag-pert-en-ca","application-district-energy-en-ca","application-water-en-ca","topic-installation-maintenance-en-ca","topic-pert-en-ca"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>PE-RT for Hot Water Lines | ISCO<\/title>\n<meta name=\"description\" content=\"Banner Health\u2019s $400M expansion required a complex underground chilled water solution. Learn how HDD and HDPE saved time and costs for the Tucson Level 1 Trauma Center.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/isco-pipe.com\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PE-RT and HDPE: The Piping Power Couple for Chilled and Hot Water Lines\" \/>\n<meta property=\"og:description\" content=\"Banner Health\u2019s $400M expansion required a complex underground chilled water solution. Learn how HDD and HDPE saved time and costs for the Tucson Level 1 Trauma Center.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/\" \/>\n<meta property=\"og:site_name\" content=\"ISCO Industries\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-19T17:00:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/isco-pipe.com\/wp-content\/uploads\/2026\/03\/ISCO_Chilled-Water_Hot-Water_PERT_HDPE_Banner_Tucson.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1501\" \/>\n\t<meta property=\"og:image:height\" content=\"714\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\\\/\",\"url\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\\\/\",\"name\":\"PE-RT for Hot Water Lines | ISCO\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/isco-pipe.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/ISCO_Chilled-Water_Hot-Water_PERT_HDPE_Banner_Tucson.webp\",\"datePublished\":\"2026-03-19T17:00:52+00:00\",\"dateModified\":\"2026-03-19T17:00:54+00:00\",\"description\":\"Banner Health\u2019s $400M expansion required a complex underground chilled water solution. Learn how HDD and HDPE saved time and costs for the Tucson Level 1 Trauma Center.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\\\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\\\/#primaryimage\",\"url\":\"https:\\\/\\\/isco-pipe.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/ISCO_Chilled-Water_Hot-Water_PERT_HDPE_Banner_Tucson.webp\",\"contentUrl\":\"https:\\\/\\\/isco-pipe.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/ISCO_Chilled-Water_Hot-Water_PERT_HDPE_Banner_Tucson.webp\",\"width\":1501,\"height\":714},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Field Reports\",\"item\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"PE-RT and HDPE: The Piping Power Couple for Chilled and Hot Water Lines\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/#website\",\"url\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/\",\"name\":\"ISCO Industries\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"PE-RT for Hot Water Lines | ISCO","description":"Banner Health\u2019s $400M expansion required a complex underground chilled water solution. Learn how HDD and HDPE saved time and costs for the Tucson Level 1 Trauma Center.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/isco-pipe.com\/","og_locale":"en_US","og_type":"article","og_title":"PE-RT and HDPE: The Piping Power Couple for Chilled and Hot Water Lines","og_description":"Banner Health\u2019s $400M expansion required a complex underground chilled water solution. Learn how HDD and HDPE saved time and costs for the Tucson Level 1 Trauma Center.","og_url":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/","og_site_name":"ISCO Industries","article_modified_time":"2026-03-19T17:00:54+00:00","og_image":[{"width":1501,"height":714,"url":"https:\/\/isco-pipe.com\/wp-content\/uploads\/2026\/03\/ISCO_Chilled-Water_Hot-Water_PERT_HDPE_Banner_Tucson.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/","url":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/","name":"PE-RT for Hot Water Lines | ISCO","isPartOf":{"@id":"https:\/\/isco-pipe.com\/en-ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/#primaryimage"},"image":{"@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/#primaryimage"},"thumbnailUrl":"https:\/\/isco-pipe.com\/wp-content\/uploads\/2026\/03\/ISCO_Chilled-Water_Hot-Water_PERT_HDPE_Banner_Tucson.webp","datePublished":"2026-03-19T17:00:52+00:00","dateModified":"2026-03-19T17:00:54+00:00","description":"Banner Health\u2019s $400M expansion required a complex underground chilled water solution. Learn how HDD and HDPE saved time and costs for the Tucson Level 1 Trauma Center.","breadcrumb":{"@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/#primaryimage","url":"https:\/\/isco-pipe.com\/wp-content\/uploads\/2026\/03\/ISCO_Chilled-Water_Hot-Water_PERT_HDPE_Banner_Tucson.webp","contentUrl":"https:\/\/isco-pipe.com\/wp-content\/uploads\/2026\/03\/ISCO_Chilled-Water_Hot-Water_PERT_HDPE_Banner_Tucson.webp","width":1501,"height":714},{"@type":"BreadcrumbList","@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/pe-rt-and-hdpe-the-piping-power-couple-for-chilled-and-hot-water-lines\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/isco-pipe.com\/en-ca\/home\/"},{"@type":"ListItem","position":2,"name":"Field Reports","item":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/"},{"@type":"ListItem","position":3,"name":"PE-RT and HDPE: The Piping Power Couple for Chilled and Hot Water Lines"}]},{"@type":"WebSite","@id":"https:\/\/isco-pipe.com\/en-ca\/#website","url":"https:\/\/isco-pipe.com\/en-ca\/","name":"ISCO Industries","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/isco-pipe.com\/en-ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"}]}},"_links":{"self":[{"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/field-reports\/10346","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/field-reports"}],"about":[{"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/types\/field-reports"}],"version-history":[{"count":2,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/field-reports\/10346\/revisions"}],"predecessor-version":[{"id":10351,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/field-reports\/10346\/revisions\/10351"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/media\/10348"}],"wp:attachment":[{"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/media?parent=10346"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/categories?post=10346"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/tags?post=10346"},{"taxonomy":"application","embeddable":true,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/application?post=10346"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/topic?post=10346"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}