{"id":8744,"date":"2023-03-03T14:42:00","date_gmt":"2023-03-03T14:42:00","guid":{"rendered":"https:\/\/isco-pipe.com\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/"},"modified":"2025-05-15T14:51:34","modified_gmt":"2025-05-15T14:51:34","slug":"isco-provides-timely-solutions-for-irrigation-canal-project","status":"publish","type":"field-reports","link":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/","title":{"rendered":"ISCO Provides Timely Solutions for Irrigation Canal Project"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"alignleft size-full is-resized\"><a href=\"https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-2.webp\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-2.webp\" alt=\"\" class=\"wp-image-2604\" style=\"width:380px\" srcset=\"https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-2.webp 800w, https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-2-300x300.webp 300w, https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-2-150x150.webp 150w, https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-2-768x768.webp 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><\/figure>\n<\/div>\n<p>Nephi Irrigation Company needed to install a large-diameter canal in the west area of Nephi, Utah because there was too much water infiltration in the existing ditch. Piping the irrigation canal with the new large-diameter pipe would minimize the amount of evaporation and water loss into the ground. <\/p>\n\n<p>The Springville, UT-based VanCon Construction, the contractor chosen for the project, contacted ISCO Industries\u2019 representatives Bob Kilpack, Rydell Johnson and Jeff Draper to supply the project with 2,400 feet of 48-inch large-diameter high density polyethylene (HDPE) pipe and related pipe fittings. Fittings included flange adaptors, back up rings, bolt kits, and fabricated elbows. <\/p>\n\n<p>Initially the project completion time frame was eight months; however, VanCon received word that the canal needed to be completed within one month of the project start date in April. The irrigation company wanted to run water into the canal sooner than expected. <\/p>\n\n<p>VanCon consulted with ISCO Industries to see if the fittings could be completed in less than one month from the order date, and delivered to the job site on time. The ISCO Industries fabrication shop was able to complete the order and produce three 48-inch elbows ahead of schedule. <\/p>\n\n<p>VanCon consulted with ISCO Industries to see if the fittings could be completed in less than one month from the order date, and delivered to the job site on time. The ISCO Industries fabrication shop was able to complete the order and produce three 48-inch elbows ahead of schedule. <\/p>\n\n<p>In addition, ISCO Field Technician Kevin Smith installed a 12-inch and 16-inch outlet for the customer with a stretch McElroy #618 fusion machine, saving VanCon from having to use reducing tees. Due to the prompt service from ISCO Industries, the irrigation company was able to run water in the canal two days earlier than expected. If ISCO Industries had not delivered the fittings on time, that part of the project would have been pushed from April to October, delaying other project components.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>ISCO Industries successfully supplied Nephi Irrigation Company&#8217;s canal project with 2,400 feet of 48-inch high-density polyethylene (HDPE) pipe and fittings, completing the order ahead of schedule. With prompt service from ISCO, the irrigation company was able to run water in the canal two days earlier than expected, saving time and avoiding delays in the project&#8217;s completion. <\/p>\n","protected":false},"featured_media":8746,"template":"","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[],"tags":[],"application":[165],"topic":[162,213],"class_list":["post-8744","field-reports","type-field-reports","status-publish","has-post-thumbnail","hentry","application-irrigation-en-ca","topic-large-diameter-pipe-en-ca","topic-project-planning-and-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ISCO Provides Timely Solutions for Irrigation Canal Project | ISCO<\/title>\n<meta name=\"description\" content=\"ISCO supplied Nephi Irrigation Company&#039;s canal project with 2,400 feet of 48-inch high-density polyethylene (HDPE) pipe and fittings, ahead of schedule.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/isco-pipe.com\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ISCO Provides Timely Solutions for Irrigation Canal Project\" \/>\n<meta property=\"og:description\" content=\"ISCO supplied Nephi Irrigation Company&#039;s canal project with 2,400 feet of 48-inch high-density polyethylene (HDPE) pipe and fittings, ahead of schedule.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/\" \/>\n<meta property=\"og:site_name\" content=\"ISCO Industries\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-15T14:51:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-Cover-Image.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1660\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/isco-provides-timely-solutions-for-irrigation-canal-project\\\/\",\"url\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/isco-provides-timely-solutions-for-irrigation-canal-project\\\/\",\"name\":\"ISCO Provides Timely Solutions for Irrigation Canal Project | ISCO\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/isco-provides-timely-solutions-for-irrigation-canal-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/isco-provides-timely-solutions-for-irrigation-canal-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/isco-pipe.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Timely-Irrigation-Canal-Cover-Image.webp\",\"datePublished\":\"2023-03-03T14:42:00+00:00\",\"dateModified\":\"2025-05-15T14:51:34+00:00\",\"description\":\"ISCO supplied Nephi Irrigation Company's canal project with 2,400 feet of 48-inch high-density polyethylene (HDPE) pipe and fittings, ahead of schedule.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/isco-provides-timely-solutions-for-irrigation-canal-project\\\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/isco-provides-timely-solutions-for-irrigation-canal-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/isco-provides-timely-solutions-for-irrigation-canal-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/isco-pipe.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Timely-Irrigation-Canal-Cover-Image.webp\",\"contentUrl\":\"https:\\\/\\\/isco-pipe.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Timely-Irrigation-Canal-Cover-Image.webp\",\"width\":1660,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/isco-provides-timely-solutions-for-irrigation-canal-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Field Reports\",\"item\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/field-reports\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ISCO Provides Timely Solutions for Irrigation Canal Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/#website\",\"url\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/\",\"name\":\"ISCO Industries\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/isco-pipe.com\\\/en-ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ISCO Provides Timely Solutions for Irrigation Canal Project | ISCO","description":"ISCO supplied Nephi Irrigation Company's canal project with 2,400 feet of 48-inch high-density polyethylene (HDPE) pipe and fittings, ahead of schedule.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/isco-pipe.com\/","og_locale":"en_US","og_type":"article","og_title":"ISCO Provides Timely Solutions for Irrigation Canal Project","og_description":"ISCO supplied Nephi Irrigation Company's canal project with 2,400 feet of 48-inch high-density polyethylene (HDPE) pipe and fittings, ahead of schedule.","og_url":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/","og_site_name":"ISCO Industries","article_modified_time":"2025-05-15T14:51:34+00:00","og_image":[{"width":1660,"height":800,"url":"https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-Cover-Image.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/","url":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/","name":"ISCO Provides Timely Solutions for Irrigation Canal Project | ISCO","isPartOf":{"@id":"https:\/\/isco-pipe.com\/en-ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/#primaryimage"},"image":{"@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/#primaryimage"},"thumbnailUrl":"https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-Cover-Image.webp","datePublished":"2023-03-03T14:42:00+00:00","dateModified":"2025-05-15T14:51:34+00:00","description":"ISCO supplied Nephi Irrigation Company's canal project with 2,400 feet of 48-inch high-density polyethylene (HDPE) pipe and fittings, ahead of schedule.","breadcrumb":{"@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/#primaryimage","url":"https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-Cover-Image.webp","contentUrl":"https:\/\/isco-pipe.com\/wp-content\/uploads\/2024\/07\/Timely-Irrigation-Canal-Cover-Image.webp","width":1660,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/isco-provides-timely-solutions-for-irrigation-canal-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/isco-pipe.com\/en-ca\/home\/"},{"@type":"ListItem","position":2,"name":"Field Reports","item":"https:\/\/isco-pipe.com\/en-ca\/field-reports\/"},{"@type":"ListItem","position":3,"name":"ISCO Provides Timely Solutions for Irrigation Canal Project"}]},{"@type":"WebSite","@id":"https:\/\/isco-pipe.com\/en-ca\/#website","url":"https:\/\/isco-pipe.com\/en-ca\/","name":"ISCO Industries","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/isco-pipe.com\/en-ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"}]}},"_links":{"self":[{"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/field-reports\/8744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/field-reports"}],"about":[{"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/types\/field-reports"}],"version-history":[{"count":3,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/field-reports\/8744\/revisions"}],"predecessor-version":[{"id":8749,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/field-reports\/8744\/revisions\/8749"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/media\/8746"}],"wp:attachment":[{"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/media?parent=8744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/categories?post=8744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/tags?post=8744"},{"taxonomy":"application","embeddable":true,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/application?post=8744"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/isco-pipe.com\/en-ca\/wp-json\/wp\/v2\/topic?post=8744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}